Case Study: Graham tracks 15,000 punch items and saves $35,000 on printing on a $285M hospital with Fieldwire
Graham Case StudySourced & dated by Case Study Desk
Key results
The challenge
Graham built the $285 million, 400,000-square-foot, 7-story Jim Pattison Children's Hospital. Printing a single set of drawings cost around $7,000, and coordinating deficiencies across floors required constant calls and texts.
The solution
Graham used Fieldwire to mark up and verify deficiencies in real time and to manage drawings, change orders, and punch items across the project.
“Initially, it was around $7,000 to print off one set of drawings, so we've saved $35,000 just on printing costs with Fieldwire.”
RBRobin BeckDocument Control Manager, Graham
The results, in context
The team tracked 15,000 punch items, 800 change orders, and 780 drawings in Fieldwire, and saved $35,000 on printing costs by no longer reprinting drawing sets. Deficiencies could be marked up, fixed, and verified in minutes from a phone.